Project Overview
FWS led the full design-build delivery of the 10-14 Satellite Well Tie-in project in Kerrobert, Saskatchewan. Completed within a tight seven-week construction window, this infrastructure upgrade integrated the well into the broader production system, enhancing fluid and gas transport efficiency while meeting strict safety and regulatory requirements.
The scope of work included the installation of specialty piping, line insulation, metering systems, and advanced safety controls — all engineered for performance, reliability, and long-term adaptability.