Project Overview
FWS delivered a design-build retrofit project to expand water treatment capacity at a beverage production facility while minimizing disruption to ongoing operations. Completed over a 10-month schedule, the project included a building expansion with foundations, utilities, and HVAC systems, along with the supply and installation of a reverse osmosis water treatment system and chemical feed system. Extensive process piping, electrical systems, and controls were integrated with the existing facility infrastructure.
Working within a confined, active operating environment required careful planning, close coordination among stakeholders, and a strong focus on safety. Enhanced measures, including accessible safety showers and eyewash stations, were incorporated to support safe operations throughout construction and commissioning.
The result was a fully operational, compliant, and high-performing water treatment facility that increased production capacity and demonstrated FWS' ability to execute complex retrofit projects while maintaining schedule, quality, and operational continuity.