Reverse Osmosis Water Treatment System Retrofit - FWS Group industrial construction project in Gimli Manitoba
Industrial Processing

Reverse Osmosis System

Gimli, Manitoba
overview

Project Overview

FWS delivered a design-build retrofit project to expand water treatment capacity at a beverage production facility while minimizing disruption to ongoing operations. Completed over a 10-month schedule, the project included a building expansion with foundations, utilities, and HVAC systems, along with the supply and installation of a reverse osmosis water treatment system and chemical feed system. Extensive process piping, electrical systems, and controls were integrated with the existing facility infrastructure.

Working within a confined, active operating environment required careful planning, close coordination among stakeholders, and a strong focus on safety. Enhanced measures, including accessible safety showers and eyewash stations, were incorporated to support safe operations throughout construction and commissioning.

The result was a fully operational, compliant, and high-performing water treatment facility that increased production capacity and demonstrated FWS' ability to execute complex retrofit projects while maintaining schedule, quality, and operational continuity.

goals

Project Goals

gallery

Project Gallery

Tools

Technologies and Innovations

Timeline

Project Timeline

Results

Results

Employee Spotlight

Meet People who make this project live

Projects

Related Successes

FWS Group logo, Canadian industrial construction companyReverse Osmosis Water Treatment System Retrofit - FWS Group industrial construction project in Gimli Manitoba
Industrial Processing

Reverse Osmosis System

Gimli, Manitoba
overview

Project Overview

FWS delivered a design-build retrofit project to expand water treatment capacity at a beverage production facility while minimizing disruption to ongoing operations. Completed over a 10-month schedule, the project included a building expansion with foundations, utilities, and HVAC systems, along with the supply and installation of a reverse osmosis water treatment system and chemical feed system. Extensive process piping, electrical systems, and controls were integrated with the existing facility infrastructure.

Working within a confined, active operating environment required careful planning, close coordination among stakeholders, and a strong focus on safety. Enhanced measures, including accessible safety showers and eyewash stations, were incorporated to support safe operations throughout construction and commissioning.

The result was a fully operational, compliant, and high-performing water treatment facility that increased production capacity and demonstrated FWS' ability to execute complex retrofit projects while maintaining schedule, quality, and operational continuity.