Fertilizer Dome concrete bulk storage - FWS Group fertilizer facility construction in Camrose Alberta
Ag-Industrial

FERTILIZER DOME

Camrose, Alberta
overview

Project Overview

This food and beverage project for Cargill Ltd. in Camrose, Alberta involved the design-build delivery of a high-capacity granular fertilizer storage and handling facility. The scope included a 150-foot diameter, 17,600 square foot concrete storage dome with 12-foot-tall walls and a capacity of 10,000 metric tonnes, supported by rail receiving at 300 MTPH and reclaim and load-out systems operating at 100 MTPH. The project also encompassed site work and dome area preparation, construction of a rail tunnel and load-out tower, mechanical installation of all belt conveyors, bucket elevators, bins, distribution, and spouting systems, as well as the construction of a 240 square foot control building near the load-out area, delivering an efficient, integrated storage solution.

goals

Project Goals

gallery

Project Gallery

Tools

Technologies and Innovations

Timeline

Project Timeline

Results

Results

Employee Spotlight

Meet People who make this project live

Projects

Related Successes

FWS Group logo, Canadian industrial construction companyFertilizer Dome concrete bulk storage - FWS Group fertilizer facility construction in Camrose Alberta
Ag-Industrial

FERTILIZER DOME

Camrose, Alberta
overview

Project Overview

This food and beverage project for Cargill Ltd. in Camrose, Alberta involved the design-build delivery of a high-capacity granular fertilizer storage and handling facility. The scope included a 150-foot diameter, 17,600 square foot concrete storage dome with 12-foot-tall walls and a capacity of 10,000 metric tonnes, supported by rail receiving at 300 MTPH and reclaim and load-out systems operating at 100 MTPH. The project also encompassed site work and dome area preparation, construction of a rail tunnel and load-out tower, mechanical installation of all belt conveyors, bucket elevators, bins, distribution, and spouting systems, as well as the construction of a 240 square foot control building near the load-out area, delivering an efficient, integrated storage solution.

goals

Project Goals

Tools

Technologies and Innovations

Results

Results