Project Overview
FWS was tasked with the installation of a new shiploader at Westshore Terminals in Delta, British Columbia, aimed at enhancing bulk material handling and optimizing loading operations. The project involved the removal of the existing shiploader and tripper and the installation of a high-capacity shiploader to improve operational efficiency. The installation process was completed within a two-week window during a 24/7 shutdown, with pre-planning taking one month to ensure minimal disruption.