Project Overview
FWS delivered a high-capacity grain terminal for G3 Canada Limited in Pasqua, Saskatchewan, featuring slipform concrete construction and 24,786 MT of steel storage. The facility includes a receiving system at 680 MTPH, a 160 MTPH grain cleaning system, and a loadout system capable of 1,600 MTPH, able to ship a full 134-car unit train in 12 hours. Supported by a 3½-mile, 134-car loop track, the terminal combines advanced storage, handling, and rail infrastructure to optimize throughput, streamline logistics, and support large-scale grain operations.












