Project Overview
FWS delivered a slipform headframe for a goldmine shaft, approximately 30 x 40 feet in plan and 208 feet high, with all construction completed in sub-zero conditions. To enable the December concrete pour, FWS designed and implemented an innovative glycol heating system, ensuring proper curing and structural integrity despite extreme temperatures.